LK Systems LK Group English
Close

LK Group

Prefab ‑ Sortiment

From start to finish

LK Installation wall OPTIMAL

a wall consisting of modules for WC, sink and shower as well as an adjustable part to adapt the width to the size of the room. All pipes, fixtures and fittings are pre-assembled. All connections are assembled in easily accessible LK Manifold Cabinets that are mounted on the ceiling or wall.

A fast and efficient solution for bathrooms

With smart solutions for prefabricated bathrooms, construction becomes both smoother and more cost-effective. LK Installation wall OPTIMAL meets all requirements and is easy to install, while the design freedom is great. It is a secure solution that is easy to maintain.

 

The installation wall is designed the way you want it

LK Installation wall OPTIMAL can be used for both new production and renovation of, for example, apartments and hotels. Bathroom construction is considerably simplified with prefabricated installation walls for toilets and washbasins. The surface layers can be varied endlessly, which gives great design freedom for architects. The prefabrication makes it easy to adapt the product to your wishes, e.g. by adding fixtures for washing machine or shower.

 

Pre-assembled pipes

LK Installation wall OPTIMAL is delivered with pre-assembled pipes for water and drainage as well as fixtures for wall-hung toilets and washbasins. All pipes and connections are from our approved Universal system.

  • All pipes, fixtures, boards and fittings are pre-assembled, therefore only surface layers need to be applied.

  • The plumber installs the installation wall himself with a few tools.

  • No restrictions in design or layout.

  • Support and help from our knowledgeable staff who are located locally throughout the country.

Efficient bathroom renovation in Karlshamn

When J. Mattsson's VVS was assigned a bathroom renovation at Karlshamnsbostäder, they chose to use the prefabricated solution LK Installationsvägg Optimal, instead of making a traditional trunk change. The result was faster installation and a better working environment.

Read more about the project