Embedding in concrete with LK Clip-Rail 16/20
LK Clip-Rail 16/20 is used for installing in screed above floor insulation.
The clip-rail is fixed to the building insulation using plastic staples. The floor heating pipes are then simply and easily pressed into the clip-rail. The clip-rail holds the pipe securely and at the correct spacing to guarantee uniform heat emission.
Once the installation is complete, screed is applied and the final floor finish can be laid.
- For new-build and renovations
- Ideal for ground-slab or setting in screed
- Suitable under all types of surface flooring
- Installation height: 0 mm for new-build, 55 mm when laying on pre-insulated floor